Thursday, February 11, 2010

44 Hermon Hill St Croix USVI















Here is an installation of TCM4IR. The multi-layered radaint barrier system has one reinforced surface (three surfaces performing) so that they can hammer tack it to the purlins before installing the final stylized metal roof. We are rejecting 98% of the Infrared Radiation and reducing the interior surface temperature of the roof by 9 degrees F. These pictures show the contractor taking heat readings under the decking, comparing two adjacent areas. One with TCM installed reads at 93 degrees F and one foot over the second area has no TCM installed and reads 109 degrees F.


No comments:

Post a Comment